Warning: session_start(): Session cannot be started after headers have already been sent in /home/cado633lm7e9/public_html/xpertworker.com/customer/index.php on line 11
Electrician
Certified electricians for all home electrical work
Basic Repairs
Ceiling, table or exhaust fan not working. Diagnosis + repair included.
Ceiling, table or exhaust fan not working. Diagnosis + repair included.
Estimated time: 30–60 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Loose switch, sparking socket, non-working plug point. Safe and fast fix.
Loose switch, sparking socket, non-working plug point. Safe and fast fix.
Estimated time: 20–40 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Replace or repair flickering or dead lights anywhere in your home.
Replace or repair flickering or dead lights anywhere in your home.
Estimated time: 20–30 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Tripping MCB, blown fuse, or main switch issues. Resolved safely.
Tripping MCB, blown fuse, or main switch issues. Resolved safely.
Estimated time: 30–60 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Installation
New ceiling fan installation including hook, rod and wiring.
New ceiling fan installation including hook, rod and wiring.
Estimated time: 45–60 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Install new lights, downlights, panels, or strip LEDs anywhere.
Install new lights, downlights, panels, or strip LEDs anywhere.
Estimated time: 30–60 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Wall mount + wiring + earthing for any brand of water heater.
Wall mount + wiring + earthing for any brand of water heater.
Estimated time: 60–90 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Dedicated 15A power point installation for your AC unit.
Dedicated 15A power point installation for your AC unit.
Estimated time: 45–60 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Wiring & Inspection
Full electrical inspection — identify faults, loose wires, overloads.
Full electrical inspection — identify faults, loose wires, overloads.
Estimated time: 60–90 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Proper earthing setup to protect appliances and family.
Proper earthing setup to protect appliances and family.
Estimated time: 60–120 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.
Setup inverter connection, battery wiring and load balancing.
Setup inverter connection, battery wiring and load balancing.
Estimated time: 60–90 min
Note: Material charges (if any) will be communicated before work begins. You pay only after the job is done.